REFERENCES
 

FIRED HEATER & REFORMER

CLIENT PROJECT NAME Q’TY DESCRIPTION DELIVERY REMARK

Samsung Total Petrochemicals.

No.2 Aromatics Complex Project/Desan, Korea

6

Steel : 1,000ton Coil : 15,650 D.I.
(Material : A335P9, A312TP310,A312TP347H)Refractory : 320m3

2013.04.30

Heurtey PCK

DeokYang Co.,Ltd.

HC-Project (Steam Reformer package H-211) / Ulsan, Korea

1

Steel : 750 ton Coil : 3,800 D.I.
(Material : A106GrB, A335P11,A335P22,A312TP304H)
Refractory : 200m3

2013.09.30

Heurtey PCK

Aramco / GS E&C

Rabigh II (CP-3/4) Project (P220-FR-2301/2302) / Saudi Arabia

2

Steel : 150 ton Coil : 2,238 D,I,
(Material : A335Gr11, A312TP310)
Refractory : 54m3

2014.10.15

Heurtey PCK

State Oil Company / Samsung Engineering Co.,Ltd

SOCARAmmonia &Urea Complex(Steam Reformer & Start-up heater)/ Azerbaijan Republic

2

Steel : 960 tonCoil : 7,200 D,I,(Material : A312 TP347,TP321,TP304H,A335P11,P22 & A106GRB)
Refractory : 335m3

2015
1ST : 02.28
2ND : 03.15
3RD : 05.30

ITT S.p.A.
,ITALY

Samsung Total Petrochemicals / Samsung C&T

STC SM#1 Modernization Project / Desan, Korea

1

Shop & Field Steel : 18ton Coil : 3,700 D.I.
(Material : A297HP Modified, 800HTB409,TP304H, A312TP310,A312TP347H)
Insulation : 52m2

2015.05.22

Heurtey PCK

ADCO / GS E&C

Rumaitha/shanayel Phase-III Project /Abu Dhabi, UAE

1

Shop Steel : 128ton Coil : 2,236 D.I. (Material : A106GRB) Refractory : 205m3

2015.07.04

Heurtey PCK

Turkmengas / Toyo-K

ECU & PE-PP Project

2

Shop Steel : 77ton Coil : 2,071 D.I.
(Material : A106GRB) Refractory : 21m3

2015.12.15

Heurtey PCK

S-OIL

Duct Modification Project

1

Shop Steel : 5.4ton
Refractory : 2.5m3

2015.09.07

Heurtey PCK

KNPC / GS E&C

KNPC Clean Fuel Project _Reformer Package / Kuwait

1

Shop Steel : 758ton Coil : 8,995 D.I.
(Material : A312TP304H,321H,A335P11,P22 & A106GRB )
Refractory : 130m3

2016
1ST : 04.30
2ND : 05.30

Heurtey PCK

KNPC / GS E&C

KNPC Clean Fuel Project _Fired Heater Package / Kuwait

7 (Heater : 5, Modifi. : 2)

Shop Steel : 986ton Coil : 18,032 D.I.
(Material : A106GRB,A312TP347H & TP310)
Refractory : 308m3

2016.03.01
~2016.03.30

Heurtey PCK

S-OIL

S-OIL RUC Project _Fired Heater Fabrication & Erection

3(Heater : 3)

Shop Steel : 469ton Coil : 6,544 D.I.
(Material : A312TP347H & TP304)
Refractory : Shop : 239m3,
Field : 32m3)

2016.04.01
~2016.08.30

Heurtey PCK

TE-3 / GS E&C

TE-3 Project_Flue Gas Cooler / Malaysia

1(Heater : 1)

Shop Steel : 239ton Coil : 5,264 D.I.
(Material : A106GRB,A312TP304)
Refractory : 78.4m3

2016.06.01
~2016.10.20

Heurtey PCK


PRESSURE VESSEL

No.

Customer / End User Project Item Q'ty Delivery
1

Lotte chemical

TE-3 Project

STEAM DRUMS

2

2016.10.30

2

Sulzer Chemtech
Pte Ltd.

S.610883702 PT_LGAA
(LG Chemical 2AA Extractor)

Column

1

2014.04.30

3

LS Industrial
Systems Co, Ltd.

LS high Voltage Transformer

Vacuum Plant Autoclave

1

2013.11.09

4

Burckhardt Compression/
Samsung Total

Samsung Daesan-03 and 04

Dampers

1

2013.09.20

2
2
5

SKEC

New PX & V Nexlene

Air Volume Tank

5

2013.08.30

3
1
1
1
1
1
6

KNPC

MAFP

Drum

1

2013.06.17

7

Golar LNG

Golar H83

Pulsation Vessel

1

2013.05.09

6

SPX

IPC Eva

Corrosion Inhibitor

1

2012.04

Cathodic Protection

1

ASME "U" Stamp Vessel

1

Antiscale Dosing

1

Biocide Dosing

1


HEAT EXCHANGER

No. Customer / End User Project Item Q'ty Delivery
1

Burckhardt Compression

POSCO SNG Project

Gascooler

5

2014.05.28

2

KNPC

Heat Exchanger

Spare Channel

1

2013.12.03

3

Burckhardt Compression/
Samsung Total

Samsung Daesan-03 and 04

Gas Coolers

1

2013.09.20

2
2
1
4

KNPC

Heat Exchanger

Spare Shell

1

2013.04.03

5

KNPC

Heat Exchanger

TUBE BUNDLE

2

2013.02.28


FLARE STACK

No. Customer / End User Project Item Q'ty Delivery
1

John Zink Hamworthy Combustion

BLNG PROJECT

Flare Stack

1

2015

1

John Zink Hamworthy Combustion

HEC TACE Project

Flare Stack Pakage

1

2015

2

John Zink International Luxembourg/Saudi Aramco

Shaybah#1

B58-U-0001A/B

2

2013

3

B58-U-0002A/B/C

3
4

B58-U-0006

1
5

Shaybah#4

B25-F-0004A

1

2013

6

B01/03-F0002A/0004A

4
7

B07-F-0004Ar

1


GAS COMBUSITION UNIT (GCU)

No. Type

Material

Dimension (mm)

Weight
(Ton)

Delivery Ship Yard

GCU ASS'Y

Outer Casing
(shell)

Inner Cylinder
(shell)

Outer
Casing

Inner
Cylinder

O.D

L

O.D

T

L

O.D

T

L

1

4500

Carbon Steel

SUS 316L

4500

12320

4030

8

9492

3580

5

8680

278

2012
~2014

DSME
/HHI
/SHI
/HSHI

2

SUS

SUS 304L

SUS 316L

4500

11095

4030

5

8267

3580

5

7455

168

3

5600

Carbon Steel

SUS 316L

5000

12916

4510

8

9742

4010

5

8795

189


SKID UNIT

No. Customer / End User Project Item Q'ty Delivery
1

Burckhardt Compression/SHI

LNGM Frame Project

Compressor Modules

2

2016.06
~ 2016.08

1

LGE Process/DSME

14026-84,000 cbm LPG carriers for SSC

LPG Reliquefaction Skid Unit

6

2015.05
~ 2015.11

2

John zink Hamworthy Combustion

Skids for Kangwon

Skids

4

2015.01.31

3

HHI/HMD/HSHI

Various

LPG Reliquefaction Skid Unit

264

2005.10
~ 2014.04

6

Linde / Burckhardt Compression AG

Linde Ulsan Pox

Oxygen Compressor Skid Unit

1

2009.12

7

WLGE

ENGRO VOPAK(UE-010)

F.W Glycol Skid Package Unit

1

2008.01

8

KCC Hyundai

Kumgang 02

Comp. Skid Unit for CH3Cl+N2

2

2007.04


STEEL STRUCTURAL

No. Customer / End User Project Item Q'ty Delivery
1

Burckhardt Compression/LG Daesan

LG Daesan-01/02

Support for
Discharge Dampers

6

2013.03.20

2

LG Daesan-01

Support

5

2013.04.19

3

Fuji

NGHI SON 1 Thermal Power Plant

Platform & Ladder

2

2012.07

4

IPB Support Structure #1/#2

Support & Structure
of IPB & Acc.

3

2012.05

5

NGHI SON 1 Thermal Power Plant

Platform Fabrication

2

2012.03


PIPING SPOOL

No. Customer / End User Project Item Q'ty Delivery
1

Hyundai Heavy Ind.

AL Dur Power & Water Company B.S.C©

AL Dur Independent Water and Power
Fabrication Pipe Spool

1

2010.01

2

Escravos Gas Proj Phase3(EGP3)

Tie-in Spool (G05011-086-04)

1

2006.09

3

Tie-in Spool / Tie-in Spool Support
(G05011-086-04)

25

2006.09

4

Tie-in Spool (G05011-086-01~03)

13

2006.01

5

Saudi Aramco Cogeneration Program(UGP)

Pipe Spool Fabrication

3

2005.06

6

Pipe Spool Fabrication

3

2005.05


Production Capacity

NO.

Equipment

Ton/Year

Maximum Manufacturing Size
(unit:mm)

THICKNESS MAX./MIN.
(MONTH CAPACITY)

1

Pressure Vessel

2,000

120t

8,000Ø

40,000L

80Ton/3mm

2

Heat Exchanger

2,000

80t

3,500Ø

20,000L

80Ton/3mm

3

Tower & Column

1,000

80t

4,000Ø

60,000L

 
4

Steam Drum

1,000

120t

3,000Ø

20,000L

 
5

Tanks

2,000

50t

10,000Ø

30,000L

80Ton/3mm

6

Skid & Module

5,000

30,000Ø

14,000H

40,000L

200Ton/3mm

7

Fired Heater

3,600

50t

9,000Ø

30,000L

300Ton/6mm